Baker Hughes offers ProductionLink™ integrated production optimization platform to provide real-time transmission and monitoring of artificial lift operational data to effectively and efficiently optimize production, regardless of lift type.
Case Study
Production Solution improves ESP system run life more than 50%
Baker Hughes Production Solution saves customer $370,000 USD per well
阿根廷Neuquén油田的主要生产商正在硫酸钙(Caso4)在电潜水泵(ESP)系统中的尺度沉积
Case Study
生产解决方案可改善每日石油生产34%,减少非生产性时间
An operator in the Eagle Ford shale in Texas was installing rod lift systems in four wells completed with 5½-in., 20-lb casing that were no longer free flowing.